Loading...
Way: 720000 (688501849)
Version #7
nettoyage tag inutile Auvergne #lzb
- Edited by Denis_Helfer
- Changeset #130853044
Tags
electrified | no |
---|---|
gauge | 1435 |
importance | regional |
maxspeed | 75 |
operator | SNCF Réseau |
passenger_lines | 1 |
railway | rail |
railway:etcs | no |
railway:kvb | no |
railway:track_ref | E |
railway:tvm | no |
ref | 720000 |
ref:FR:SNCF_Reseau | 720000,1,E,257.245,257.747 |
source | BDOrtho IGN |
usage | main |
Part of
2 relations
Nodes
4 nodes
- 6734828268 (part of ways Ligne de Figeac à Arvant (717082611) and Ligne de Figeac à Arvant (717081428))
- 6734828269 (part of way 717081430)
- 1030632907
- 6456474490 (part of ways 1047804968 and 720000 (717081429))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |