Loading...
Way: Donald Lee Hollowell Parkway Northwest (746009001)
Version #6
US 78 start dates, remove tiger tags
Tags
HFCS | Principal Arterial - Other |
---|---|
bicycle | yes |
foot | yes |
highway | primary |
lanes | 4 |
maxspeed | 45 mph |
name | Donald Lee Hollowell Parkway Northwest |
note | "start_date" is when this roadway was first improved (widened, straighted, surfaced, bridges, etc), not when it was first built |
ref | US 78;US 278;GA 8 |
sidewalk | both |
start_date | 1928 |
surface | asphalt |
Part of
4 relations
- Relation 8 (269475)
- Relation 278 (1714770)
- Relation 78 (2310573)
- Relation MARTA 50 Donald L. Hollowell Parkway (8759804)
Nodes
5 nodes
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |