Loading...
Way: Boston Subdivision (760673234)
Version #4
Change operator on Boston Subdivision trackage from CP 3 to CP 45 to the MBTA. This trackage was purchased from CSX in 2012 and operations were switched to the MBTA in 2014. And additional changeset will follow to set the old operator tags.
- Edited by KevinMapsThings
- Changeset #140610141
Tags
electrified | no |
---|---|
gauge | 1435 |
maxspeed | 60 mph |
name | Boston Subdivision |
old_railway_operator | NYC |
operator | MBTA |
operator:wikidata | Q171985 |
railway | rail |
usage | main |
Part of
5 relations
- Relation Train CR-Worcester Outbound Express: South Station => West Natick => Worcester (16330142)
- Relation Train CR-Worcester Outbound Limited Express: South Station => Framingham => Worcester (16330143)
- Relation Train CR-Worcester Outbound: South Station => Wellesley Farms => Worcester (16330144)
- Relation Boston Subdivision (4815771)
- Relation Amtrak Lake Shore Limited: Boston => Chicago (10946019)
Nodes
7 nodes
- 6276872994 (part of ways 670265640 and Boston Subdivision (760673235))
- 993384715
- 993384714
- 993384713
- 993384712
- 993384711
- 993384709 (part of way Boston Subdivision (85631837))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |