Loading...
Way History: 4600 (797243279)
Version #2
mapped tunnel details
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 80 |
operator | DB Netz AG |
passenger_lines | 2 |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:track_ref | 2 |
railway:traffic_mode | mixed |
ref | 4600 |
source:maxspeed | Geschwindigkeitssignal (Lf 7 "8") beim Streckenkilometer 49,0 |
start_date | 1861 |
usage | main |
voltage | 15000 |
Nodes
3 nodes
- 7390840436 (part of way Neckar-Alb-Bahn (790560737))
- 6368917495
- Tübingen Hbf (1757678392) (part of way 4600 (800851434))
Version #1
Bahn-Relation 766 Hzl zwischen Tübingen und Sigmaringen aktualisiert
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 80 |
operator | DB Netz AG |
passenger_lines | 2 |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:track_ref | 2 |
railway:traffic_mode | mixed |
ref | 4600 |
source:maxspeed | Geschwindigkeitssignal (Lf 7 "8") beim Streckenkilometer 49,0 |
start_date | 1861 |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Plochingen–Tübingen |
Nodes
3 nodes
- 7390840436 (part of way Neckar-Alb-Bahn (790560737))
- 6368917495
- Tübingen Hbf (1757678392) (part of way 4600 (800851434))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |