Loading...
Way History: Caltrain Peninsula Subdivision (868469334)
Version #6
Add PTC.
- Edited by ISTJ-T 1w9
- Changeset #150544365
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 60 |
gauge | 1435 |
layer | 1 |
maxspeed | 79 mph |
maxspeed:freight | 45 mph |
name | Caltrain Peninsula Subdivision |
operator | Peninsula Corridor Joint Powers Board |
operator:wikidata | Q107126073 |
owner | Peninsula Corridor Joint Powers Board |
railway | rail |
railway:ptc | yes |
railway:track_ref | 1 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 8095106558 (part of way Caltrain Peninsula Subdivision (868469333))
- 8095106565 (part of way Caltrain Peninsula Subdivision (1002754228))
Version #5
Caltrain: OCS completed and energized
- Edited by astro_furball
- Changeset #150238219
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 60 |
gauge | 1435 |
layer | 1 |
maxspeed | 79 mph |
maxspeed:freight | 45 mph |
name | Peninsula Subdivision |
operator | Peninsula Corridor Joint Powers Board |
operator:wikidata | Q107126073 |
owner | Peninsula Corridor Joint Powers Board |
railway | rail |
railway:track_ref | 1 |
tiger:cfcc | B11 |
tiger:county | San Mateo, CA |
tiger:name_base | Union Pacific Railroad |
tiger:name_base_1 | Joint Powers Authority RR |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 8095106558 (part of way Caltrain Peninsula Subdivision (868469333))
- 8095106565 (part of way Caltrain Peninsula Subdivision (1002754228))
Version #4
add operator:wikidata=Q107126073 to Peninsula Corridor JPB trackage
Tags
bridge | yes |
---|---|
construction:electrified | contact_line |
construction:frequency | 60 |
construction:voltage | 25000 |
electrified | no |
gauge | 1435 |
layer | 1 |
maxspeed | 79 mph |
maxspeed:freight | 45 mph |
name | Peninsula Subdivision |
operator | Peninsula Corridor Joint Powers Board |
operator:wikidata | Q107126073 |
owner | Peninsula Corridor Joint Powers Board |
railway | rail |
railway:track_ref | 1 |
tiger:cfcc | B11 |
tiger:county | San Mateo, CA |
tiger:name_base | Union Pacific Railroad |
tiger:name_base_1 | Joint Powers Authority RR |
usage | main |
Nodes
2 nodes
- 8095106558 (part of way Caltrain Peninsula Subdivision (868469333))
- 8095106565 (part of way Caltrain Peninsula Subdivision (1002754228))
Version #3
remove track number from name
Tags
bridge | yes |
---|---|
construction:electrified | contact_line |
construction:frequency | 60 |
construction:voltage | 25000 |
electrified | no |
gauge | 1435 |
layer | 1 |
maxspeed | 79 mph |
maxspeed:freight | 45 mph |
name | Peninsula Subdivision |
operator | Peninsula Corridor Joint Powers Board;Union Pacific Railroad |
owner | Peninsula Corridor Joint Powers Board |
railway | rail |
railway:track_ref | 1 |
tiger:cfcc | B11 |
tiger:county | San Mateo, CA |
tiger:name_base | Union Pacific Railroad |
tiger:name_base_1 | Joint Powers Authority RR |
usage | main |
Nodes
2 nodes
- 8095106558 (part of way Caltrain Peninsula Subdivision (868469333))
- 8095106565 (part of way Caltrain Peninsula Subdivision (1002754228))
Version #2
electrification under construction
- Edited by xephos1one
- Changeset #102750904
Tags
bridge | yes |
---|---|
construction:electrified | contact_line |
construction:frequency | 60 |
construction:voltage | 25000 |
electrified | no |
gauge | 1435 |
layer | 1 |
maxspeed | 79 mph |
maxspeed:freight | 45 mph |
name | Peninsula Subdivision MT1 |
operator | Peninsula Corridor Joint Powers Board;Union Pacific Railroad |
owner | Peninsula Corridor Joint Powers Board |
railway | rail |
railway:track_ref | 1 |
tiger:cfcc | B11 |
tiger:county | San Mateo, CA |
tiger:name_base | Union Pacific Railroad |
tiger:name_base_1 | Joint Powers Authority RR |
usage | main |
Nodes
2 nodes
- 8095106558 (part of way Caltrain Peninsula Subdivision (868469333))
- 8095106565 (part of way Caltrain Peninsula Subdivision (1002754228))
Version #1
Partial updates on the 25th Avenue grade separation project. The relations and other minor thing still need to be fixed. I'm about to switch to JOSM to fix them.
Tags
bridge | yes |
---|---|
electrified | no |
gauge | 1435 |
layer | 1 |
maxspeed | 79 mph |
maxspeed:freight | 45 mph |
name | Peninsula Subdivision MT1 |
operator | Peninsula Corridor Joint Powers Board;Union Pacific Railroad |
owner | Peninsula Corridor Joint Powers Board |
railway | rail |
railway:track_ref | 1 |
tiger:cfcc | B11 |
tiger:county | San Mateo, CA |
tiger:name_base | Union Pacific Railroad |
tiger:name_base_1 | Joint Powers Authority RR |
usage | main |
Nodes
2 nodes
- 8095106558 (part of way Caltrain Peninsula Subdivision (868469333))
- 8095106565 (part of way Caltrain Peninsula Subdivision (1002754228))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |