Way History: Southern Beltway (626289370)
Version #4
PA: Revert Changeset 112568700, as only 2 ramps are open for the new I-79/PA-Turnpike-576 interchange till 2022. (I-79 NB -> PA-576 WB & PA-576 EB -> I-79 SB are the only open movements)
- Edited by rickmastfan67
- Changeset #112632016
Tags
access | no |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
maxspeed | 70 mph |
name | Southern Beltway |
note | To be a stub until I-79-PA 43 segment starts construction; leave toll tag missing until future toll points confirmed |
oneway | yes |
ref | PA Tpke 576 |
ref:penndot | SR 7576 |
sidewalk | no |
surface | concrete |
Nodes
3 nodes
- 19 (5912719057) (part of ways Southern Beltway (626289332) and 626289373)
- 5912719056
- 5912719530 (part of way Southern Beltway (626289368))
Version #3
Open remaining ramps
- Edited by OrdinaryScarlett
- Changeset #112568700
Tags
access | no |
---|---|
highway | motorway |
lanes | 2 |
maxspeed | 70 mph |
name | Southern Beltway |
note | To be a stub until I-79-PA 43 segment starts construction; leave toll tag missing until future toll points confirmed |
oneway | yes |
ref | PA Tpke 576 |
ref:penndot | SR 7576 |
sidewalk | no |
surface | concrete |
Nodes
3 nodes
- 19 (5912719057) (part of ways Southern Beltway (626289332) and 626289373)
- 5912719056
- 5912719530 (part of way Southern Beltway (626289368))
Version #2
prepare new Southern Beltway (PA 576) for opening on 2021-10-15
- Edited by Your Village Maps
- Changeset #112353078
Tags
access | no |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
maxspeed | 70 mph |
name | Southern Beltway |
note | To be a stub until I-79-PA 43 segment starts construction; leave toll tag missing until future toll points confirmed |
oneway | yes |
ref | PA Tpke 576 |
ref:penndot | SR 7576 |
sidewalk | no |
surface | concrete |
Nodes
3 nodes
- 19 (5912719057) (part of ways Southern Beltway (626289332) and 626289373)
- 5912719056
- 5912719530 (part of way Southern Beltway (626289368))
Version #1
PA Turnpike 576 construction (section 55C1-1 to 55C2-2)
Tags
construction | motorway |
---|---|
construction:surface | concrete |
fut_ref | PA 576 |
fut_ref:penndot | SR 7576 |
highway | construction |
lanes | 2 |
maxspeed | 70 mph |
name | Southern Beltway |
note | To be a stub until I-79-PA 43 segment starts construction; leave toll tag missing until future toll points confirmed |
oneway | yes |
ref | PA Tpke 576 |
sidewalk | no |
toll | no |
Nodes
3 nodes
- 19 (5912719057) (part of ways Southern Beltway (626289332) and 626289373)
- 5912719056
- 5912719530 (part of way Southern Beltway (626289368))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |