Loading...
Way: Southern Beltway (626289370)
Version #1
PA Turnpike 576 construction (section 55C1-1 to 55C2-2)
Tags
construction | motorway |
---|---|
construction:surface | concrete |
fut_ref | PA 576 |
fut_ref:penndot | SR 7576 |
highway | construction |
lanes | 2 |
maxspeed | 70 mph |
name | Southern Beltway |
note | To be a stub until I-79-PA 43 segment starts construction; leave toll tag missing until future toll points confirmed |
oneway | yes |
ref | PA Tpke 576 |
sidewalk | no |
toll | no |
Nodes
3 nodes
- 19 (5912719057) (part of ways Southern Beltway (626289332) and 626289373)
- 5912719056
- 5912719530 (part of way Southern Beltway (626289368))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |